Document Type

Closed Project

Publication Date

Winter 1992

Instructor

Richard F. Deckro

Course Title

Manufacturing Management I

Course Number

EMGT 510

Abstract

In this paper we suggest a method to achieve optimum system efficiency when used on very small production lot sizes with associated high costs and dynamic changes, as are typically found in high dollar capital equipment manufactures. We analyze a specific case, and applied a hybrid planning and production approach to achieve an optimum solution.

Description

This project is only available to students, staff, and faculty of Portland State University.

Persistent Identifier

http://archives.pdx.edu/ds/psu/22624

Share

COinS