Document Type

Closed Project

Publication Date

Fall 2003

Instructor

Dundar Kocaoglu

Course Title

Engineering and Technology Management

Course Number

EMGT 520/620

Abstract

The largest Engineering Management challenge in the conversion from 200mm to 300mm wafer processing no longer lies within the cleanrooms of the fab plants themselves. Instead, the challenges are in establishing common interface standards between multiple vendors wafer handling, transportation and processing machinery. Especially between the FOUP (Front Opening Unified Pod) and processing machinery. In addition the Engineering Manager must integrate new designs for the buildings, material supply and infrastructure required into an optimum operating model.

Rights

In Copyright. URI: http://rightsstatements.org/vocab/InC/1.0/ This Item is protected by copyright and/or related rights. You are free to use this Item in any way that is permitted by the copyright and related rights legislation that applies to your use. For other uses you need to obtain permission from the rights-holder(s).

Comments

This project is only available to students, staff, and faculty of Portland State University

Persistent Identifier

http://archives.pdx.edu/ds/psu/23535

Share

COinS