Document Type
Closed Project
Publication Date
Fall 2002
Instructor
Timothy Anderson
Course Title
Operations Research
Course Number
EMGT 540/640
Subjects
Silicon industry -- Management, Semiconductor industry, Operations research, Wacker Siltronic -- Inventory control -- Management
Abstract
Wacker Siltronic has the majority of its plant capacity consumed at the beginning of a month with forecasted orders or "good will" orders from customers. However, there is typically some left over capacity that enables Wacker to meet emergency short notice orders from customers. The objective of the Inventory Simulation Program is to determine the minimum inventory requirements for Wacker to meet these random orders in a typical month.
Rights
In Copyright. URI: http://rightsstatements.org/vocab/InC/1.0/ This Item is protected by copyright and/or related rights. You are free to use this Item in any way that is permitted by the copyright and related rights legislation that applies to your use. For other uses you need to obtain permission from the rights-holder(s).
Persistent Identifier
http://archives.pdx.edu/ds/psu/23779
Citation Details
Munoz, Samantha; Al-Khaili, Mubarak; and Magboul, Sulaiman, "Wacker Siltronic Project" (2002). Engineering and Technology Management Student Projects. 1490.
http://archives.pdx.edu/ds/psu/23779
Comments
This project is only available to students, staff, and faculty of Portland State University