Document Type
Closed Project
Publication Date
Fall 1996
Course Number
ETM 550/650
Abstract
Analyzes the operation of a saw chain manufacturing line to determine if a buffer would significantly enhance effectiveness. The data is used to extrapolate to a more complex saw chain manufacturing line to determine the possible effectiveness of buffers
Rights
In Copyright. URI: http://rightsstatements.org/vocab/InC/1.0/ This Item is protected by copyright and/or related rights. You are free to use this Item in any way that is permitted by the copyright and related rights legislation that applies to your use. For other uses you need to obtain permission from the rights-holder(s).
Persistent Identifier
http://archives.pdx.edu/ds/psu/24423
Citation Details
Grindle, Dana; Turgeon, Elizabeth; and Stratton, Bud, "A Study of a Paced Sequential Transfer Line Process and the Effects of Introducing Buffers" (1996). Engineering and Technology Management Student Projects. 1752.
http://archives.pdx.edu/ds/psu/24423
Comments
This project is only available to students, faculty, and staff of Portland State University.