Document Type

Closed Project

Publication Date

Fall 1996

Course Number

ETM 550/650

Abstract

Traditional production systems methodologies, such as optimization and group technology, can be combined with lean production thinking to dramatically reduce the cycle time and maximize resource utilization. While these techniques can be effectively used to obtain improved results, the examples described in this paper assume deterministic task duration times and predecessor task completion.

Description

This project is only available to students, faculty, and staff of Portland State University.

Persistent Identifier

http://archives.pdx.edu/ds/psu/24425

Share

COinS