Document Type

Closed Project

Publication Date

2000

Instructor

Timothy Anderson

Course Title

Manufacturing Systems Engineering

Course Number

EMGT 550

Abstract

Abstract:

This paper researches the problems and potential solution for forecast1ng capacity in a high mix low volume (HMLV) printed circwt board manufacturing job shop. The factory is faced with a myriad of issues from products being late, the forecast leading or lagging actual output, and the ability to effectively determine what the right option is when dealing with forecasting issues. Alternatives for forecasting capacity are addressed using Time Series forecasting, Linear Regression, a constant number based on simulation, and a simulation-based forecaster.

Rights

In Copyright. URI: http://rightsstatements.org/vocab/InC/1.0/ This Item is protected by copyright and/or related rights. You are free to use this Item in any way that is permitted by the copyright and related rights legislation that applies to your use. For other uses you need to obtain permission from the rights-holder(s).

Comments

This project is only available to students, staff, and faculty of Portland State University

Persistent Identifier

http://archives.pdx.edu/ds/psu/24568

Share

COinS