Abstract
ABC, a semiconductor manufacturing company has the good fortune to be starting a very strong manufacturing ramp for its biggest money making product line. In order for the ramp to succeed, they have to ensure that at the four main production steps where all the WIP goes through, there is enough capacity to run production as the ramp progresses through the wafer start nodes outlined, in a potentially optimized way, and the new tools purchased for this purpose are staffed adequately. However, based on the definition of the model utilized, the latter part of the project was changed substantially in practice.
Rights
In Copyright. URI: http://rightsstatements.org/vocab/InC/1.0/ This Item is protected by copyright and/or related rights. You are free to use this Item in any way that is permitted by the copyright and related rights legislation that applies to your use. For other uses you need to obtain permission from the rights-holder(s).
Persistent Identifier
http://archives.pdx.edu/ds/psu/21628
Citation Details
Varma, Sumir, "Planning for a Semiconductor Ramp: Capacity and Staffing" (2015). Engineering and Technology Management Student Projects. 247.
http://archives.pdx.edu/ds/psu/21628
Comments
This project is only available to students, staff, and faculty of Portland State University