A contractor is dealing with the construction of two dams 515 miles apart. The objective of the firm is to minimize total excavation cost for the two projects, the transportation cost of machinery, and losses due to shut-down of machinery during transportation.
Rights
In Copyright. URI: http://rightsstatements.org/vocab/InC/1.0/ This Item is protected by copyright and/or related rights. You are free to use this Item in any way that is permitted by the copyright and related rights legislation that applies to your use. For other uses you need to obtain permission from the rights-holder(s).
Persistent Identifier
http://archives.pdx.edu/ds/psu/21851
Citation Details
Iyigun, Mehmet Guven and Tor, Abdulmennan, "Excavation Rate and Work Force Planning" (1989). Engineering and Technology Management Student Projects. 349.
http://archives.pdx.edu/ds/psu/21851
Comments
This project is only available to students, staff, and faculty of Portland State University