Abstract

The Portland Aerial Tram is an interesting project that is taking place locally in downtown Portland. We feel that it is a great example to analyze this project in cost, schedule and performance since it is a project that is happening closely to all of us.

This paper generally introduces the background information of the Portland Aerial Tram project and identifies the reason why we choose this project. The problem definition and assumption are provided in this paper to analyze the problems. Major problems of this project are:

• Schedule delayed

• Cost increased

Rights

In Copyright. URI: http://rightsstatements.org/vocab/InC/1.0/ This Item is protected by copyright and/or related rights. You are free to use this Item in any way that is permitted by the copyright and related rights legislation that applies to your use. For other uses you need to obtain permission from the rights-holder(s).

Comments

This project is only available to students, faculty, and staff of Portland State University.

Persistent Identifier

http://archives.pdx.edu/ds/psu/22803

Share

COinS