Document Type

Technical Report

Publication Date

2-2005

Subjects

Columbia River Watershed -- Introduced mollusks -- Control, Columbia River Watershed -- Introduced organisms -- Effect on hydroelectric power plants, Zebra mussels -- Environmental aspects

Abstract

The purpose of this study was to estimate costs to the Federal Columbia River Power System hydroelectric projects in the event of a zebra mussel infestation.

Description

Prepared for the Bonneville Power Administration

Persistent Identifier

http://archives.pdx.edu/ds/psu/4798

Share

COinS